Did you know we have operations in Europe? Visit our sister site Altenex Energy

Munich Reinsurance America

Princeton, NJ

Scope

As a fast-tracked project under the NJ Pay for Performance Program, develop a plan to reduce this 450,000 sq. ft. facility’s energy usage and produce an incentive in the process.

Results
  • Following energy reduction plan submission, audit results led to implementation of these Energy Conservation Measures with an actual cost of $3,200,000 and actual savings of $1,000,000:
    – Lighting Upgrades
    – Complete Encellium Lighting Controls Installation
    – DDC Upgrade (Automated Logic)
    – Chiller Upgrade
  • Energy usage reduced by over 40%
  • $1.3 million incentive contributed to over 30% of project costs